On January 28, 2021, a liquid nitrogen release at the Foundation Food Group Prepared Foods Division poultry processing plant in Gainesville, Georgia, resulted in 6 worker fatalities and multiple injuries. A flexible hose connected to a liquid nitrogen cryogenic freezer failed, releasing a large quantity of nitrogen into the enclosed facility. The oxygen-deficient atmosphere incapacitated and killed workers who were not aware of the danger or were attempting to rescue colleagues.
The facility had no atmospheric oxygen monitoring system, no audible or visible alarms distinct from the building fire alarm, and no remotely operated emergency isolation valves on the nitrogen supply. Emergency stop (E-stop) switches were located in areas that became immediately inaccessible once the nitrogen began to accumulate. Workers had not been adequately trained on the asphyxiation hazards of inert gases and cryogens.
This incident traced to breakdowns across 1 PSM element (PHA). Each represents a documented gap that process safety documentation and consulting can close before a similar event occurs at your facility.